CONTRACTING - Just read more page as it is - GREEN 4 EVER PTY LTD COAL TAILINGS

CONTRACTING

Gladstone Ports Authority

 
  • Superior Coal (SCL) obtained a contract to clean out the environmental dams, process the coal.
  • SCL built a low cost demountable plant
  • Utilised hired dredges as the resource was below sea level
  • Emptied the dams, and made available the coal to the client


 
 
 
 
 
 
Rhondda
  • Clough Mining Services (CMS) obtained a contract to re-mine the tailings dams, re-process, and deliver coal to the client
  • Fraser Alexander supervised the hydraulic mining
  • CMS built and installed a processing plant - the basic separation was based on sizing

Mt Piper

  • CMS negotiated a JV with Pozzolanic called Mt Piper Ash (MPA)
  • With MPA negotiated and won a contract with Pacific Power (NSW Govt) to accept the dry fly ash, transport it, deposit it in the adjacent open cut void, and manage the ash dump.
  • MPA undercut the in house price for these works and retained this contract for many years.